EC Capacity Required Calculator
Data-centre gas generation sizing with BESS contribution
LEU · Ireland · ≥10 MVA
Inputs
Demand
IT Load Required
MW
PUE
ratio
Utilisation Factor
0 – 1
Generation Assets
Gas Generator Size per Unit
MW
BESS Capacity
MW
BESS Duration
hours
De-rating Factors
BESS De-rating Factor
0 – 1
Gas De-rating Factor
0 – 1
Full Load Demand
—
MW
IT × PUE
BESS De-rated
—
MW
—
Gas Installed
—
MW
—
Gas Units Required
—
units
—
Capacity Surplus
—
MW
De-rated supply − full load
De-rated Capacity Split · Gas vs BESS
Gas
BESS
Gas 0%
(0 MW de-rated)
BESS 0%
(0 MW de-rated)
Detailed Breakdown
De-rated Supply Stack